Asteria Global

Jp proposal ag 2025 003

JP Outdoor Living — Asteria Global
DESIGN · BUILD · TRANSFORM

Outdoor
Living

Transformation
Deerlake Ranch, Chatsworth, CA 91311 · 7 Weeks · 11 Deliverables · 2 Date Palms
$30,000
Total Investment
7
Weeks
11
Deliverables
Scroll ↓
EXISTING CONDITIONS
Before — Your Property Today
Full blank canvas — bare compacted soil throughout front yard, backyard and side yards. Existing concrete steps to entry. Ready for a complete transformation.
Front — Entry
Front — Wide
Front — Driveway
Backyard — West
Side Yard
Backyard
Backyard — Hillside
FRONT YARD

Grand Entry with Date Palms

Enlarged entry stepstones from sidewalk to front door create a grand approach. Premium artificial turf replaces bare soil. Two 10ft Date Palms flanking the entry create an iconic desert-luxury first impression. Perimeter drip irrigation on both sides — plant-ready whenever you are.

BACKYARD

Bermuda Grass & Pergola Lounge

Lush Bermuda grass sod covers the full backyard — drought-tolerant for SoCal. Enlarged stepstones on both side entries. A prefab pergola + elevated deck with integrated string lights and recessed LEDs creates a shaded outdoor lounge area.

COMPLETED WORK SAMPLE

Side Yard — Stepstones · Gravel · Wall Lighting

Completed — Turf + Platform
Vision — Pergola + Deck
DETAILED BREAKDOWN
Scope of Work
01
Design & Project Management PLANNING
Full landscape design, site plan, material selection and on-site PM throughout.
WKS 1
$1,800
02
Site Preparation & Grading INFRASTRUCTURE
Excavation, soil grading, debris removal, base compaction.
WKS 1
$1,500
03
Drip Irrigation — Perimeter INFRASTRUCTURE
Full drip irrigation both side yards. Smart controller, rain sensor, emitters.
WKS 2
$3,200
04
Landscape Lighting ELECTRICAL
20+ LED fixtures. Step lights, path lights, deck lighting, uplighting.
WKS 2–4
$4,000
05
Entry Stepstones — Front HARDSCAPE
Large-format concrete stepstones. Premium widened approach.
WKS 2–3
$2,800
06
Back Stepstones — Both Sides HARDSCAPE
Enlarged stepstones left and right back entries. Matching material.
WKS 2–3
$2,400
07
Artificial Turf — Front SOFTSCAPE
Premium synthetic turf. Weed barrier, compacted base, infill.
WKS 3–5
$3,800
08
Bermuda Grass — Backyard SOFTSCAPE
Bermuda sod. Drought-tolerant. Soil amendment, grading, irrigation.
WKS 4–5
$3,800
09
Date Palms (2x 10ft) SOFTSCAPE
Two 10ft Date Palms flanking entry. Delivery, planting, staking.
WKS 3–4
$1,800
10
Pergola + Deck + Lighting STRUCTURE
Aluminum pergola, elevated deck. String lights + recessed LED.
WKS 3–6
$4,000
11
Soil Amendment & Finishing FINISHING
Soil prep, bark mulch, edging, final cleanup and walkthrough.
WKS 6–7
$900
TOTAL PROJECT INVESTMENT
$30,000
SCHEDULE
Project Timeline — 7 Weeks
W1
W2
W3
W4
W5
W6
W7
Design & PM
Site Prep
Irrigation
Stepstones
Lighting
Turf + Palms
Pergola+Deck
Bermuda
Finishing
INVESTMENT
Payment Schedule
PAYMENT 01
Deposit
Due upon contract signing
50%
$15,000
PAYMENT 02
Progress
Hardscape & turf complete
30%
$9,000
PAYMENT 03
Final
Project completion & walkthrough
20%
$6,000
TOTAL PROJECT INVESTMENT
$30,000
LEGAL
Terms & Conditions

All work by licensed and insured professionals under Asteria Global Inc.

Additional plants beyond 2 Date Palms not included.

Scope changes require a written Change Order by both parties.

Client responsible for HOA approvals and permits prior to start.

No add-ons unless in signed Change Order. Valid 30 days.

Asteria Global Inc. acts as technology marketplace intermediary.

READY TO BEGIN
Accept This Proposal

By accepting below, you authorize Asteria Global Inc. to begin the outdoor living transformation at Deerlake Ranch.

$30,000
Investment
7 Wks
Timeline
11
Deliverables

By clicking Accept, you acknowledge that you have reviewed the scope, pricing, and terms. A countersigned copy will be sent via email.
ASTERIA GLOBAL INC.[email protected] · +1 (424) 508-5174 · asteriaglobalus.com
We Also Accept — Debit & Credit Cards | Visa | Mastercard | American Express
Prepared for: JP · AG-2025-003 · Confidential

Proposal Accepted

Thank you, . Recorded on .