Asteria Global

Parthenia Plaza Proposal

Parthenia Corner Plaza — Asteria Global
Asset Repositioning Opportunity

Parthenia
Corner Plaza

15313 Parthenia St, North Hills, CA 91343

9,558 SF
Retail
Corner
Location
High Traffic
Exposure
Value Add
Opportunity
The Opportunity

A Diamond
in the Rough

Six tenants. Prime corner at Parthenia & Columbus. High traffic. But the 1972 facade suppresses rental rates — aging stucco, mismatched signage, dated canopies, worn finishes.

The building has good bones. It needs a face-lift that matches the potential of its location.

Transformation

Drag to Reveal

After
Before
Before
After
Design Highlights

Modern Facade

Clean stucco, strong lines, cohesive identity.

Enhanced Lighting

LED uplighting, canopy & pole lights.

Unified Signage

Channel letters, professional & modern.

Landscaping

Drought-tolerant, elevated curb appeal.

Better Experience

Modern storefronts, attract & retain.

Material Palette

Built to Last

Light
Stucco
Wood
Panel
Metal
Black
Stone
Concrete

Exterior

Smooth stucco, flat charcoal canopy, vertical pilasters.

Lighting

~29 LED fixtures. 40% energy savings.

Value Creation

A Smarter Investment.
A Stronger Future.

A modern plaza increases visibility, drives traffic, attracts stronger tenants, and supports higher rents.

  • Increased Leaseability
  • Higher Perceived Value
  • Stronger Tenant Retention
  • Long-Term NOI Growth
Scope of Work

Three Phases. Eight Weeks.

01
Concept Design
Weeks 1–2
$4,500
  • Site visit
  • Measurements
  • 2–3 concepts
  • Material palettes
  • 3D renders
  • Lighting concept
  • Presentation
  • Approval
02
Design Development
Weeks 3–5
$6,500
  • Full development
  • Material specs
  • Elevations
  • Lighting plan
  • Signage program
  • Parking & ADA
  • Common areas
  • 2 revisions
03
Docs & Permits
Weeks 5–8
$7,500
  • Stamped plans
  • Engineering
  • Electrical
  • LADBS submittal
  • Coordination
  • Doc package
  • Print & digital
  • Approval
Total Design & Plans Investment
$18,500
50%
$9,250
Upon signing
30%
$5,550
Concept approval
20%
$3,700
Final delivery

6–8 Weeks from Concept to Permits

Valid 30 days • 2 revisions • Permit fees separate • Construction proposal available

Ready to Begin

Accept This Proposal

Authorize Asteria Global to begin design for 15313 Parthenia St.

$18,500
Investment
6–8 Wk
Timeline
3 Phases
Deliverables
Countersigned copy emailed upon acceptance.

The New Face of Parthenia

North Hills, California

Modern • Inviting • Strategic • Built for the Future
Asteria Global Inc. — 18124 Parthenia St, Suite C, Northridge, CA 91325 — (562) 642-1929Visa | Mastercard | Amex

Proposal Accepted

Thank you, . We’ll contact you within 24 hours.